Contract details | |
---|---|
Contract number | PRK00298-17 |
Business unit owner | Power Services |
Contract dates | 19 June 2017 to 31 March 2025 |
About this contract
A general outline of the work to be carried out under the contract comprises: but is not limited to:
- testing, calibrating and certification of the installed diesel fuel meters.
- installation, repairs and maintenance of bulk diesel storage tanks, diesel transfer pumping systems and associated pipe work.
- mechanical and electrical installation of diesel generating sets, ranging from 50kw to 1.5 megawatt, electrical output, including remote radiators and exhaust, fuel, pneumatic and oil systems.
- construction, repairs and maintenance of Power and Water’s related assets on aboriginal and remote communities.
The site of the Works in which the Superintendent shall require the works to be carried out is in remote communities in the Katherine Region, including, but not limited to the following:
Barunga | Beswick | Borroloola | Bulman |
Daly Waters | Jilkminggan | Manyalluk | Kalkarindji/Daguragu |
Lajamanu | Larrimah | Minyerri | Mataranka |
Ngukurr | Rittarangu/Urapunga | Pine Creek | Robinson River |
Timber Creek | Bulla | Kildurk/Amanbidji | Yarralin |
Pigeon Hole | Gorge Camp | Gilwi | Wandangula |
Kybrook | Weemol | Binjari |
Name | Location (state) | Category/region |
---|---|---|
Goshawk Contracting | NT | N/A |
Territory Engineering Pty Ltd | NT | N/A |
The panel will remain closed for a period of 12 months unless Power and Water determines that owing to changed circumstances the size of the panel is inadequate.
First anniversary date - 19 June 2018.
Power and Water may appoint additional members to the panel under the same assessment criteria contained in the original Request for Tender.
Contact details
For more information about this panel contract, please contact pwc.procurement@powerwater.com.au